The building is still coming along nicely - and is still on schedule. There was a topping off ceremony two weeks ago, so the building is as high as it's going to get. At the construction site there was food, refreshments, a band and speeches.
We should be able to get into the building in March to install the network equipment. In June we should be able to install some studios and then in early August we should be able to start moving broadcasters. In the best case scenario everyone will be moved by the end of December. More likely, though, is everyone moved by the end of February 2009.
Time is going by very fast and my work on buying things needed in the new building is heating up. The network equipment I mentioned was ordered last week - at a cost of over $2M. New studio equipment will be ordered soon - for more than $1M. Studio furniture, racks for the computer equipment, an in-house monitoring system ,etc., etc. It's getting busy, but this is the fun part.
Friday, December 14, 2007
The new Radio Free Europe building...
Posted by Al Tischler at 12:47 PM
Labels: new building, radio free europe, rfe/rl
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment